Well, here we are with update 1 (yes, that is a near-two hour gap between posts) and I've got as far as installing the floor(?)
[spoiler]
The floor
The supports
[/spoiler]
I've stretched wire mesh between the upright bits of the trolley and called that the floor., I intend to cable tie these later (which I need to pick up from the pound shop on Friday) but for now they're holding as they are. I've also added two strips of mesh to hold them on (as a just in case they give up measure).
For the moment it's still upright because I haven't the means (nor reason) to mount it on my bike yet. This is also the reason I've left the top section as it is, I plan on mounting it using the handle, some parts I have lying around and some more parts that the pound shop will provide.
And no, I don't plan on leaving it canary yellow, it's to get me to a festival full of metalheads, it WILL be getting a paint job before it's called finished
Ok, not a major update, but still an update
[spoiler]
The floor
The supports
[/spoiler]
I've stretched wire mesh between the upright bits of the trolley and called that the floor., I intend to cable tie these later (which I need to pick up from the pound shop on Friday) but for now they're holding as they are. I've also added two strips of mesh to hold them on (as a just in case they give up measure).
For the moment it's still upright because I haven't the means (nor reason) to mount it on my bike yet. This is also the reason I've left the top section as it is, I plan on mounting it using the handle, some parts I have lying around and some more parts that the pound shop will provide.
And no, I don't plan on leaving it canary yellow, it's to get me to a festival full of metalheads, it WILL be getting a paint job before it's called finished
Ok, not a major update, but still an update
As you do...